Roof Replacement in Quincy, MA

An old Quincy roof can hide a lot: two or three layers of shingles, gapped board sheathing, rusted flashing and a chimney that has been patched for decades. Our roof replacement in Quincy, MA strips it all away and builds a new roof from the deck up, with ice barrier, new flashing and real ventilation, priced in writing up front.

(781) 773-2885

Get a Free Estimate

Tell us about the roof. Only your name and phone are required.

Form powered by splitforms

Roof replacement tear-off with new underlayment on a home in Quincy, MA

When a roof replacement makes sense in Quincy

  • Shingles are brittle, curled or bald across most of the roof.
  • Ice dams and leaks return every winter despite repairs.
  • There are already two or more layers of roofing.
  • The roof deck sags or feels soft underfoot.
  • A low-slope roof on a multi-family has widespread blisters, splits and ponding.

Unsure? A roof inspection will tell you how much life is left.

Our roof replacement process

Roof replacement with old shingles removed and new underlayment going down in Quincy, MA

Estimate and permit. We measure, discuss materials and colors, and pull the city permit. On multi-families, we work out access and timing with the owner and tenants.

Staging. Tight Quincy streets often call for careful dumpster placement and sometimes a street permit. We protect neighboring cars, fences and plantings.

Tear-off. Every old layer comes off down to the boards or plywood. Gutters, windows and siding are protected along the way.

Deck work. Gapped or damaged board sheathing is repaired or covered with new plywood so the roof has a solid, flat base.

New roof. Ice barrier at the eaves and valleys, synthetic underlayment, new drip edge and flashing, then shingles or a low-slope membrane, depending on the roof. Vents are added or upgraded.

Finish. Magnet sweep, debris removal, walkthrough and final city inspection.

Roof replacement on triple-deckers

The main roof on most triple-deckers is low-slope and needs a membrane, not shingles. We remove the old roofing, check the deck and insulation, and install a new membrane with careful flashing at parapets, chimneys, hatches and drains. Porch and bay roofs are often replaced at the same time so the whole building is on the same schedule.

Ice barrier and ventilation

In Quincy's climate, what goes under the roof matters as much as the surface. Ice barrier at the eaves, valleys and penetrations protects against ice dam backup and wind-driven rain. Balanced intake and exhaust keep the deck cold in winter, which reduces ice dams, and cooler in summer, which helps shingles last.

Choosing materials for an older home

Architectural shingles suit most pitched roofs in Quincy and come in colors that fit older homes well, from weathered grays to deep browns. On Victorians and historic houses, we can help you pick a profile and color that respects the house's character. On flat roofs, we explain the membrane options and how each handles snow and foot traffic.

During the work

You can stay home, though tear-off day is loud. Move cars off the street in front of the house if possible, keep pets inside and take fragile items off top-floor walls. Most single-family roofs take one to three days. Multi-families may take longer depending on the number of roof sections.

Neighbors and narrow lots

Houses in Quincy Point, North Quincy and Wollaston often stand just a few feet apart. During a tear-off, we tarp the neighbor's side, cover their shrubs and windows when they face the work, and keep chutes and dumpsters closed. At the end, we run the magnet over both yards and the sidewalk. A quick note to the neighbors before we start goes a long way.

Seasonal timing

Late spring through fall is best for shingle installation, since warmth helps sealant strips bond. We do replace roofs in colder months on clear days, opening only what can be closed the same afternoon, and we hand-seal shingle edges when temperatures are low.

When the job is done, you receive the closed permit and product information for the materials installed.

Expect a short walkthrough on the last day, when we point out the new flashing, vents and any deck repairs we made.

Roof replacement FAQs

How long will it take?

One to three days for most single-family homes.

Do you replace flat roofs on triple-deckers?

Yes, including porch and bay roofs.

Do you handle the permit?

Yes, and the final inspection.

How do I get an estimate?

Call (781) 773-2885.

Planning a roof replacement?

Call (781) 773-2885 for a free on-roof estimate and a written scope.